The mast is designed as a freestanding structure not anchored to the ground.
The assembly and erection of the tower shaft are carried out without the use of a crane; all structural components can be transported and assembled using manual labor alone.
The shaft is erected using a hydraulic cylinder powered by an electric pump. Assembly is scheduled to be performed by a single specialized steel structure installation team within a maximum of 2–3 days. monterów konstrukcji stalowych w ciągu maksymalnie 2-3 dni.
The structure is transported on a semi-trailer adapted for carrying 40-foot shipping containers.
The structure reaches a maximum height of nearly 44 meters and has a load-bearing capacity of 10 m².