The mast was designed as a free-standing structure not connected to the ground.
The assembly and erection of the tower shaft is carried out without the use of a crane. All structural elements can be transported and assembled only by human hand.
The shaft is erected using a hydraulic actuator controlled by an electric pump. The assembly work is planned to be performed by 1 specialist team of steel structure assemblers within a maximum of 2-3 days.
The structure is transported on a truck semi-trailer adapted to transport 40-foot sea containers.
The maximum height of the structure is almost 44m with a load capacity of 10m2
Carbonpro sp. z o.o. is implementing the project "Participation in the Concordia Design Accelerator acceleration program under the B2B/B2A/Investor track" as part of the project entitled "Concordia Design Accelerator – We turn ideas into human profit" and the Startup Booster Poland – Smart Up program under the European Funds for Modern Economy program.
Project objective: Validation of results obtained using the CFD method using experimental wind tunnel testing.