Self-erecting, mobile telecommunications mast

Towers, masts, chimneys, pylons

Description of the project

  • The mast was designed as a free-standing structure not connected to the ground.
  • The assembly and erection of the tower shaft is carried out without the use of a crane. All structural elements can be transported and assembled only by human hand.
  • The shaft is erected using a hydraulic actuator controlled by an electric pump. The assembly work is planned to be performed by 1 specialist team of steel structure assemblers within a maximum of 2-3 days.
  • The structure is transported on a truck semi-trailer adapted to transport 40-foot sea containers.
  • The maximum height of the structure is almost 44m with a load capacity of 10m2
Request an offer

Contact us

Call us to get more information or discuss the details

+48 608 539 911

    Informacja UE

    Carbonpro sp. z o.o. is implementing the project "Participation in the Concordia Design Accelerator acceleration program under the B2B/B2A/Investor track" as part of the project entitled "Concordia Design Accelerator – We turn ideas into human profit" and the Startup Booster Poland – Smart Up program under the European Funds for Modern Economy program.

    Project objective: Validation of results obtained using the CFD method using experimental wind tunnel testing.

    Funding: PLN 379,072.36