The first above-ground storage of explosives for mining in Poland

Towers, masts, chimneys, pylons

Description of the project

  • Reinforced concrete, monolithic structure with a lightweight roof designed in case of an explosion
  • Earth rampart around the building in accordance with the requirements of the regulation as protection against the effects of an uncontrolled explosion
  • Unique solutions inside, including the method of storage and access to blasting materials
  • CarbonPro was responsible for a multi-discipline project containing a storage building and the necessary accompanying infrastructure – a covered access, an emergency rainwater drainage system, a power supply installation with a lightning and surge protection system, and others.
Request an offer

Contact us

Call us to get more information or discuss the details

+48 608 539 911

    Informacja UE

    Carbonpro sp. z o.o. is implementing the project "Participation in the Concordia Design Accelerator acceleration program under the B2B/B2A/Investor track" as part of the project entitled "Concordia Design Accelerator – We turn ideas into human profit" and the Startup Booster Poland – Smart Up program under the European Funds for Modern Economy program.

    Project objective: Validation of results obtained using the CFD method using experimental wind tunnel testing.

    Funding: PLN 379,072.36